Company Profile
As a world-leading intelligent technology company, TCL CSOT (TCL China Star Optoelectronics Technology Co., Ltd.) was established in 2009, specialized in the semiconductor display field, with the largest single electronic plant building of Asia and G8.5 production line of largest individual capacity in the world. Its market share among the top six Chinese TV brands has ranked the first place continuously during 2014-2019, and in Q1-Q2 of 2020, its TV panel sales volume ranked second place in the world Project Summary.
Project Summary
The project is located at the northern gateway of Shenzhen Bay Super Headquarters Base, surrounded by headquarter buildings of many famous companies, high-end residence, and a wetland park. The plot is next to Baishi Road on the north, one block away from Kingkey Banner Plaza; adjacent to Shenwan 2nd Road on the west, facing Shenzhen OCT Middle School across the road; next to Baishi 2nd Road on the south; and connects with Zhouwan 2nd Street and Telling Telecommunication Headquarter Building on the east.
Land Planning Indicators
Work Content
This tender will determine the architectural design scheme of this project, and the bid winner will be responsible for the architectural schematic design within the project land boundary to reach the extent that the scheme can be used to apply for construction (wherein, the content of architectural design shall reach the extent of design development) as well as construction drawing design cooperation, review, and control of scheme effects involved in each consultant’s work, construction cooperation, review and control of the side effects, landscape conceptual scheme design, and interior public part conceptual design.
Registration Requirements
(1)Â Independently registered design agencies from home and abroad with relevant design experience can apply. No qualification restriction is imposed at the application stage. No application of an individual or combination of individuals is accepted.
(2)Â Design consortium participation is allowed with no more than two members. And the members of a consortium shall not further apply alone or join another consortium to apply or participate as a consultant;
(3)Â The designers participating in the bidding shall be registered personnel of the design agencies. Chief designers shall be persons who have led several projects of the same type and must participate in the whole bidding and make scheme presentations as per review requirements. To ensure that the project designers have an accurate understanding of the regional background of China and the related requirements, the project designees shall have at least one person fluent in Chinese;
(4)Â Â Design agencies that apply shall submit the application documents and draft concepts as required in the Tender Document (see 6.1 Requirements for Application Documents for detailed requirements).
WORK RULES
This tender will proceed at three stages: the 1st stage is the application and prequalification stage; the 2nd stage is the design competition stage; the 3rd stage is the bid award stage.
1st Stage – Application and Prequalification Stage
Open application is adopted for this tender. Six bidders will be shortlisted to enter the second stage, the design competition stage, after the prequalification of the applying bidders.
2nd Stage – Design Competition Stage
Shortlisted bidders shall submit the deliverables meeting the requirements of the Design Brief. The scheme review committee will adopt an open ballot to select the top three winning candidates without ranking to enter the third stage, the bid award stage.
3rd Stage – Bid Award Stage
After the planning review of the top three schemes, the Tenderer will establish a bid award committee according to law to decide the big winner from the top three winning candidates by voting. The bid winner will be awarded the Architectural Scheme Design Contract of this project, while the other two winning candidates will receive the corresponding bonus.
Tender Schedule (Tentative)
*All the time mentioned is Beijing time. The Tenderer reserves the right to adjust the schedule. Any change will be notified three days in advance.
Prizes
The top three winning candidates will be selected in this tender, and except for the bid winner, the other two winning candidates will receive a bonus of RMB 1 million. The payment of the bonus will start after the final bid award results are announced.
COMPENSATION
If the deliverables submitted by other shortlisted bidders meet the requirements of the Tender Document, they will separately receive design compensation of RMB 600,000, the payment of which will start after the scheme review results are announced.
The announcement is published on AIMIR’s website now. If you want to more following details regarding to this competition, please feel free to contact AIMIR. What’s more, you’re more than welcome to touch base with us if you need architectural visualization.